ProjectLocations normal #icon-1899-0288D1-normal highlight #icon-1899-0288D1-highlight 19-10 WWTP Upgrade

Project Type: Public
Increases sewer capacity for the town from 3800 EDU to 5400 EDU.
Cost estimate: $
Est. Completion Date: 1/1/2026

]]>
#icon-1899-0288D1-122.611245,45.155018,0
18-14 City Shops Decant Facility

Project Type: Public
This project is a substantial portion of the City's TMDL implementation plan, including the new Mercury Rule. The decant facility will provide the City with a point source from which it can manage its stormwater effluent in compliance with the Clean Water Act.
Cost estimate: $
Est. Completion Date: 8/30/2022

]]>
#icon-1899-0288D1-122.596303,45.153492,0
21-02 Molalla Forest Road - Park Road

Project Type: Public
A significant connectivity project: working to reconcile right-of-way and provide aesthetically pleasing access road for vehicles, bikes, and pedestrians, to the new Chief Yelkus Park, Bear Creek Subdivision, and the walking bridge to highway 211.
Cost estimate: $
Est. Completion Date: 4/1/2023

]]>
#icon-1899-0288D1-122.597865,45.154470,0
20-03 Eckerd Ave, 2nd St, Lola Ave Sewer and Water line replacement

Project Type: Public
High priority I and I and water loss project under consent decree. Replacement project for an older part of town. This project will include brief water service shutdowns which shall be coordinated in advance. Local traffic will be unaffected, but we recommend thru traffic use alternate routes.
Cost estimate: $
Est. Completion Date: 10/1/2022

]]>
#icon-1899-0288D1-122.572422,45.145431,0
18-02 Dyer miscellaneous development review and general engineering

Project Type: Public
The Engineer of Record for the City reviews development civil plans. The costs associated are recovered by review fees.
Cost estimate: $
Est. Completion Date: 7/1/2022

]]>
#icon-1899-0288D1-122.577634,45.149970,0
21-12 New Police Facility

Project Type: Public
Property acquisition complete, project manager contracted, next step is procuring design architect. Full project completion projected in FY24-25 depending on funding.
Cost estimate: $
Est. Completion Date: 1/30/2025

]]>
#icon-1899-0288D1-122.573707,45.149043,0
18-08 OR 213 / Toliver Roundabout

Project Type: Public
The first roundabout in ODOT Region 1, this project will bring much needed safety improvements to one of the most dangerous intersections in Oregon.
Cost estimate: $
Est. Completion Date: 1/1/2025

]]>
#icon-1899-0288D1-122.603851,45.155820,0
20-07 Strawberry Park

Project Type: Public
A new younger-age park on Mary Drive.
Cost estimate: $
Est. Completion Date: 7/31/2022

]]>
#icon-1899-0288D1-122.582839,45.157383,0
21-09 Chief Yelkus Park

Project Type: Public
A new park for the west side of town. Property Acquisition Complete, design phase in public process with Parks CPC. Full project completion projected in FY22-23, or early in FY23-24.
Cost estimate: $
Est. Completion Date: 1/1/2024

]]>
#icon-1899-0288D1-122.598306,45.152107,0
21-10 Molalla Civic Center Improvements

Project Type: Public
Facilitates the move of Planning, Engineering, and Public Works to the Civic Center, and provides space for Council, Court, and Planning Commission.
Cost estimate: $
Est. Completion Date: 10/1/2023

]]>
#icon-1899-0288D1-122.580000,45.150132,0
18-04 Biosolids Removal

Project Type: Public
An ongoing daily effort, as part of converting the current lagoons to clean effluent storage ponds for the new wastewater plant.
Cost estimate: $
Est. Completion Date: 6/1/2025

]]>
#icon-1899-0288D1-122.611181,45.152943,0
17-20 Sawyer Truck Repair

Project Type: Private
Diesel Repair Shop with Frontage Improvements along Toliver Rd.
Cost estimate: $
Est. Completion Date: 10/1/2022

]]>
#icon-1899-0288D1-122.599979,45.155475,0
18-16 Hix Tractor Supply Store

Project Type: Private
New Retail Store
Cost estimate: $
Est. Completion Date: 7/30/2023

]]>
#icon-1899-0288D1-122.603488,45.155127,0
19-04 Cascade Center Commercial Development

Project Type: Private
Multi - Commercial Development
Cost estimate: $
Est. Completion Date: 10/30/2021

]]>
#icon-1899-0288D1-122.590657,45.147962,0
20-01 Colima Apartments

Project Type: Private
Apartment Complex
Cost estimate: $
Est. Completion Date: 1/1/2023

]]>
#icon-1899-0288D1-122.605794,45.149437,0
21-01 Bartell Partition and Development (Patrol Street)

Project Type: Private
Partition 704 Patrol Street into three buildable lot and construct 2 - Duplex and 1 - SF Home
Cost estimate: $
Est. Completion Date: 8/30/2022

]]>
#icon-1899-0288D1-122.563960,45.146837,0
21-16 Housing Needs and Production DLCD Grant

Project Type: Public
A statutory requirement and the first step in the process of discussing UGB expansion.
Cost estimate: $
Est. Completion Date: 7/1/2023

]]>
#icon-1899-0288D1-122.577625,45.149944,0
17-12 Shirley Street Curb Extensions, bulbouts

Project Type: Public
This project will adjust the aggressive curb extensions that were installed as part of Clark Park Phase 4. The intent is to allow School Bus and Fire Truck traffic an easier time navigating the intersection.
Cost estimate: $
Est. Completion Date: 9/30/2023

]]>
#icon-1899-0288D1-122.567674,45.150323,0
22-02 501 E Main Street - C Store

Project Type: Private
Change in use with Frontage Improvements along OR-211
Cost estimate: $
Est. Completion Date: 10/30/2022

]]>
#icon-1899-0288D1-122.572883,45.146751,0
22-04 New 2.0 MG Tank at Water Treatement Plant

Project Type: Public
Provides significant increase in water storage capacity to ensure demand can be met and curtailment can be avoided under reasonable circumstances. Currently exploring property acquisition needs and availability.
Cost estimate: $
Est. Completion Date: 7/1/2024

]]>
#icon-1899-0288D1-122.546087,45.130249,0
22-05 WTP Tracer Study

Project Type: Public
Drinking water from the Molalla river is Disinfected prior to being sent to town for distribution. To ensure adequate disinfection, the Oregon Health Authority regulates how much time raw water must be in contact with chlorine to be effective. This study ensures that the new filter addition achieves adequate contact time.
Cost estimate: $
Est. Completion Date: 7/1/2022

]]>
#icon-1899-0288D1-122.545497,45.129869,0
22-07 Cascade Place Apartments

Project Type: Private
214 new Apartments behind the new Grocery Outlet.
Cost estimate: $
Est. Completion Date: 12/1/2022

]]>
#icon-1899-0288D1-122.591046,45.147372,0
22-08 Planning Consultant

Project Type: Public
Development proceeds at a rapid pace and this consultant temporarily expands City staff's planning capacity. This is necessary to ensure the City meets statutory timeliness requirements.
Cost estimate: $
Est. Completion Date: 6/30/2022

]]>
#icon-1899-0288D1-122.577873,45.150132,0
22-09 1000 W. Main St (Affordable Apartments)

Project Type: Private
SDR07-2021 brings affordable apartments to the west side of town.
Cost estimate: $
Est. Completion Date: 2/1/2023

]]>
#icon-1899-0288D1-122.594920,45.149246,0
22-10 WWTP Interim Capacity Determination

Project Type: Public
The WWTP Master Plan is now four years old and the City needs to ensure the assumptions from the plan are still accurate. This study will also be used as a baseline for development to study their impacts to the system until the new plant can be constructed.
Cost estimate: $
Est. Completion Date: 5/15/2023

]]>
#icon-1899-0288D1-122.609696,45.153369,0
22-11 River Meadows Subdivision

Project Type: Private
The Horn of Molalla
Cost estimate: $
Est. Completion Date: 12/31/2022

]]>
#icon-1899-0288D1-122.581479,45.159998,0
22-12 RWUP Update for New Coleman Field

Project Type: Public
A new field for irrigating recycled water. There will be a public process associated with this project, and it will be competed in conjunction with the new Wastewater Plant's NPDES permit process.
Cost estimate: $
Est. Completion Date: 7/1/2025

]]>
#icon-1899-0288D1-122.551219,45.136437,0
22-15 Mercury TMDL Implementation Plan

Project Type: Public
DEQ has listed the City of Molalla as a "designated management agency" under the new 2019 Total Maximum Daily Loading Implementation Plan approved by the US EPA for Mercury Loading. This project updates the City's procedures and strategies for achieving compliance.
Cost estimate: $
Est. Completion Date: 9/1/2022

]]>
#icon-1899-0288D1-122.542778,45.151091,0
22-16 Coffee Shop (31330 OR 213)

Project Type: Private
New Retail Store
Cost estimate: $
Est. Completion Date: 1/1/2023

]]>
#icon-1899-0288D1-122.604880,45.152920,0
22-17 Sewer Pipe Lining 2022 (Toliver, S. Molalla)

Project Type: Public
Slip lining of concrete pipe that has no gaskets and is known to be contributing to inflow and infiltration.
Cost estimate: $
Est. Completion Date: 9/30/2022

]]>
#icon-1899-0288D1-122.579219,45.153402,0
22-18 Wooden Streetlight Pole Replacements (with PGE Option A)

Project Type: Public
27 old wood laminated street light posts installed as option B over the years have been condemned by PGE inspection reports. This project replaces them with composite option A posts and new LED lamps.
Cost estimate: $
Est. Completion Date: 12/31/2022

]]>
#icon-1899-0288D1-122.571458,45.152245,0
22-19 Molalla Forest Road Resurfacing and Reopening

Project Type: Public
This project looks at reopening Molalla Forest Road, a high priority from the master plan, at a reduced initial cost by allowing for a modified cross-section that takes advantage of the existing infrastructure.
Cost estimate: $
Est. Completion Date: 1/30/2024

]]>
#icon-1899-0288D1-122.589589,45.140002,0
22-20 Toliver at Trinity Estates, Mainline Replacement

Project Type: Public
180 ft of 12" C-200 Plastic pipe ruptured on 7/28 resulting in system wide loss of pressure and a boil water notice. This file is to handle replacement of the broken section with C-900, including chlorination and pressure testing.
Cost estimate: $
Est. Completion Date: 10/1/2022

]]>
#icon-1899-0288D1-122.588797,45.154359,0
22-21 Section St Rehabilitation

Project Type: Public
Repair of failing truck route road; spot fixes of old steel water line; stormwater improvements to match.
Cost estimate: $
Est. Completion Date: 9/30/2025

]]>
#icon-1899-0288D1-122.579704,45.143230,0
22-22 On Call Paving Services (Road Maintenance Resurfacing Program)

Project Type: Public
Contractor capable of Chip Seal, grind-and-inlay, leveling layer and overlay, crack seal, and dig out-replace options.
Cost estimate: $
Est. Completion Date: 8/30/2027

]]>
#icon-1899-0288D1-122.577638,45.149831,0
22-23 Fifth Street Duplex with Storm and Alley Improvements

Project Type: Private
Duplex located on 5th street with storm and frontage improvements
Cost estimate: $
Est. Completion Date: 12/1/2022

]]>
#icon-1899-0288D1-122.566308,45.141114,0
22-24 Water Distribution System Pressure Zoning and PRV Installation

Project Type: Public
This project will split the distribution system into one high and one low pressure zone by adding pressure reducing valves at two locations within the City. The purpose of this project is to bring pressures into the normal 80-90 psi range from their current 100-110 psi range, which is causing excess water loss and main line breaks as the system ages. This project is part of a wholistic management strategy for ensuring the town's water supply over the next 20-year horizon.
Cost estimate: $
Est. Completion Date: 1/1/2025

]]>
#icon-1899-0288D1-122.589435,45.156778,0
22-25 City Hall Police Dept HVAC Emergency Replacement

Project Type: Public
This project replaces undersized HVAC Units serving the Molalla Police Dept which causes high heat hazards in the workspace.
Cost estimate: $
Est. Completion Date: 10/31/2022

]]>
#icon-1899-0288D1-122.576489,45.148098,0
22-26 Establishing a Temperature Allocation for Molalla in the Willamette TMDL

Project Type: Public
During the first writing of the Total Maximum Daily Loading for Oregon the City of Molalla was not afforded a temperature allocation for summer use of the Molalla River. Beginning in January 2023 the DEQ is re-evaluating these rules. This project tracks the City's work as a stakeholder to petition the State for its temperature allocation like those afforded to most other Cities in Oregon.
Cost estimate: $
Est. Completion Date: 1/30/2024

]]>
#icon-1899-0288D1-122.542963,45.148831,0